|
|
|
| Lesoth
Highlands Water Project |
|
|
|
|
 |
|
 |
|
 |
|
 |
| Katse
Lake at sunset |
750
litres of water per
second are being
released to down steam
villages |
The
plunge pool was created
to capture the water
during spills |
Plunge
pool seen from the top
of the wall |
|
|
|
|
 |
 |
 |
 |
| Overflow
openings |
The
construction of the
intake tower |
The
Katse dam wall seen from
top... |
...and
from the bottom |
|
|
|
|
 |
 |
 |
 |
| During
the construction of the
wall |
The
lake created by the
Mohale Dam |
The Mohale Dam
is part of the Lesotho Highlands Water Project |
The
Katse Dam seen from the back |
|
|
|
|
 |
|
|
|
| King Letsie III and South
African President Thabo Mbeki inaugurating Mohale Dam |
|
|
|
|
|
|
|